Latest News from Bridge Parapets Limited |
|
Bahrain Success !
BPL has recently been awarded the contract to supply over 7000 metres of a new American AASHTO system. The three rail system was chosen for its aesthetic qualities in having a rounded post profile and oval rails. Delivery will start in mid 2006 and be completed the same year.
Contractor : Nass – Murray Roberts JV
Engineer : Atkins |
|
|
|
|
BPL launch the new VISIFLEX Pedestrian Guard Rail
!
See our separate page for details of the latest contribution to pedestrian safety on the public highway |
|
|
|
|
|
UK Motorway – Parapet Replacements on the M3
The UK Highways Agency is upgrading bridge parapets to bring them up to European Code EN 1317 requirements. BPL won the competitive tender for this fast track contract
Contractor : Birse Civils
Engineer : Mott MacDonald |
|
|
|
|
UK Term Maintenance Area 3
BPL continues to strengthen its working relationship with Raynesway Construction South (RCS). For the third year we are working closely with the on site team in completing replacement parapet works on major motorway and trunk roads.
Term Maintenance Contractor : RCS
Agent: Mott MacDonald |
|
|
|
|
|
The longest bridge in Ireland!
BPL will soon be installing its aluminium parapet system on the Blackwater Crossing Viaduct in Fermoy, County Cork. Spanning the Blackwater River valley with a total span of 450 metres the new road forms part of the new N8 motorway.
Contractor: Strabag International GmbH
Engineer : Benaim |
|
|
|
Do not compromise on public safety - BPL supply on a worldwide basis. |