Latest News from Bridge Parapets Ltd |
|
Bahrain Success !
We have completed “on – time” delivery of over 7000 metres of our BPL 333 system to the prestigious Durrat resort scheme in Bahrain being constructed by the Nass - Murray Roberts JV. This new system is designed to AASHTO and was chosen for its robust aesthetic qualities.
Engineer : Atkins |
|
|
|
|
Ireland's longest bridge
BPL has supplied and installed the BPL 104 system to the Blackwater Crossing in Fermoy, County Cork. At over 500 metres span the bridge is the largest ever constructed in Ireland and forms part of the N8 corridor. With special thanks to Benaim Group for use of the photographs.
Contractor: Strabag AG
Engineer: Benaim Group |
|
|
|
|
|
BPL has successfully launched the new VISIFLEX Pedestrian Guardrail.
The improved high visibility qualities of VISIFLEX are already contributing to improved pedestrian road safety ... Look out for the inventor’s technical paper (A Clearer Vision for Pedestrian Guardrails) to the Institute of Civil Engineers giving a full history of high visibility pedestrian guardrail. |
|
|
|
|
UK Term Maintenance Area 3
BPL continues to strengthen its working relationship with Balfour Beatty Infrastructure Services Ltd. For the third year we are working closely with the on site team in completing replacement parapet works on major motorway and trunk roads.
Term Maintenance Contractor : Balfour Beatty ISL
Agent: Mott MacDonald |
|
|
|
|
Do not compromise on public safety |